Latest News


Sep 1, 2011, 9:00 AM
After drilling an appraisal well in 2006, Wintershall Noordzee B.V. subsequently drilled a near-horizontal open-hole side track into the Schloctern sandstone. The well was completed using a 4-1/2” StageFrac lower completion consisting of 5 Packer-Plus ball- actuated sliding sleeves with tandem open-hole packers. The completion program called for each zone to be fracced with 500,000 lb of coated 12/18 ceramic using an aggressive tip-screen-out, maximising net-pressure build-up, fracture width and fracture conductivity. Each fracced zone was to be isolated by dropping a large diameter metal ball in the displacement stage, pumping it to the ‘next seat up the completion’ and then hydraulically opening the sleeve to provide access to the next zone to be fracced. In landing on the seat, the ball isolated the previously fracced zone from the next operation.
Oct 6, 2010, 9:00 AM
StimWell’s first two campaigns on Valhall have been pronounced an absolute success by BP Norge with 1stclass vessel operation and ensuing high production. The first campaign early in the summer encompassed a multi-zone coiled-tubing acid stimulation using NorthWell Gefro’s abrasive jetting tool and subsequent acid pumping through Weatherford’s...
Oct 5, 2010, 9:00 AM
Since starting operations in July 2010, StimWell has performed 43 treatments in the Norwegian and British sectors of the North Sea. This has required the registration of some 40 chemicals with the Norwegian Pollution Control Authority through AddEnergy, and with DECC and the State Supervision of Mines through CEFAS for the UK and Dutch Sectors...
Sep 1, 2010, 9:01 AM
In September, the StimWell Services Vessel, Island Patriot successfully completed a major proppant fracturing campaign for Wintershall in the Upper and Lower Slochteren (Rotliegend) in the Dutch Sector of the North Sea. The Campaign consisted of...
Jul 24, 2010, 9:00 AM
BP has awarded Stimwell Services an initial 4 year contract for their prestigious Valhall re-development. The contract has been extended to cover all of BP’s work in the North Sea and with 2 x 3 year options, has a value up to NOK 2 billion. The Island Patriot vessel will be primarily used by BP but acknowledging the gaps in their utilisation, is being marketed to all North Sea customers on a first come, first-served guaranteed booking arrangement...

stimwell-logo-full

General Enquiries:

StimWell Services
Beacon Innovation Centre
Beacon Park
Gorleston-on-Sea
Great Yarmouth
NR31 7RA

Vessel Address:

StimWell Services
c/o Copco A/S
Vestkraftkaj 4C
DK-6701
Esbjerg
Denmark

Contact Details:

Tel: +44 (0) 1493 448021

Email: sales@stimwellservices.com

Web: www.stimwellservices.com