Latest News


Aug 1, 2015, 9:00 AM
As a part of StimWell’s dedication to the continuous improvement of the vessel and its systems, the Island Patriot has seen a number of improvements since her introduction in 2010. The most notable of these improvements were undertaken during the vessel’s scheduled docking in the Fayard Shipyard in Odense in July of 2015, where a bulbous bow and additional bow tunnel thruster were installed.
Jul 1, 2015, 9:00 AM
StimWell Services has been awarded full accreditation by DNV for their integrated management system covering the main three International standards ISO 9001:2008/ ISO 14001:2004/ OHSAS 18001:2007/ relating to Quality, Environmental and Health and Safety respectively.
Apr 1, 2014, 9:00 AM
StimWell Services completed a series of acid fracturing treatments on three subsea wells in the central North Sea in the spring of 2014. This work was unique as it was the first time that a large high rate acid treatment was successfully placed by a stimulation vessel through a light well intervention vessel (LWIV) in the North Sea.
Sep 1, 2011, 9:00 AM
After drilling an appraisal well in 2006, Wintershall Noordzee B.V. subsequently drilled a near-horizontal open-hole side track into the Schloctern sandstone. The well was completed using a 4-1/2” StageFrac lower completion consisting of 5 Packer-Plus ball- actuated sliding sleeves with tandem open-hole packers. The completion program called for each zone to be fracced with 500,000 lb of coated 12/18 ceramic using an aggressive tip-screen-out, maximising net-pressure build-up, fracture width and fracture conductivity. Each fracced zone was to be isolated by dropping a large diameter metal ball in the displacement stage, pumping it to the ‘next seat up the completion’ and then hydraulically opening the sleeve to provide access to the next zone to be fracced. In landing on the seat, the ball isolated the previously fracced zone from the next operation.
Oct 6, 2010, 9:00 AM
StimWell’s first two campaigns on Valhall have been pronounced an absolute success by BP Norge with 1stclass vessel operation and ensuing high production. The first campaign early in the summer encompassed a multi-zone coiled-tubing acid stimulation using NorthWell Gefro’s abrasive jetting tool and subsequent acid pumping through Weatherford’s...

stimwell-logo-full

General Enquiries:

StimWell Services
Beacon Innovation Centre
Beacon Park
Gorleston-on-Sea
Great Yarmouth
NR31 7RA

Vessel Address:

StimWell Services
c/o Copco A/S
Vestkraftkaj 4C
DK-6701
Esbjerg
Denmark

Contact Details:

Tel: +44 (0) 1493 448021

Email: sales@stimwellservices.com

Web: www.stimwellservices.com